Danny Long CastingDanny needed a complete solution for lighting and power for the sound proof casting studio, and office space in Chippendale Sydney.
|
Churchills Bar
Churchills Bar in Kingsford Sydney needed a spruce up. We used 100m of festoon cable attached to the under side of the awning all the way around the front of the hotel, with LED frosted Warm white bulbs, for a classic timeless look of American dining retro style. High grade commercial fairy lights were used in the beer gardens foliage to create an inviting atmosphere.
|
Mosman Council
Mosman Council needed to bring some beauty to Military Road. We lit up 2 trees at the Post Office, A giant tree at The Council Chambers and a Tree in the middle of a intersection at Bradleys head Rd and Middle Head Rd for a dazzling effect.
|
Canterbury Leagues ClubMichal from Atlas Access got in touch, and asked if I could assist in some maintenance work on the lifting system in The Canterbury Leagues Club's Foyer Dome Lifting System. I re-engineered the top most limit switch to prevent the hook from over running. Fabricated 2 new remotes complete with Emergency Stop switches, Extended the radio range of the receiver, and fixed up the electrical system powering the whole rig.
I also added a constant tension cable reeler, so we could have power at the hook, regardless of the hooks position. |
Marrickville CouncilLand and Marine Constructions contracted my services to deliver the electrical requirements on a major upgrade to a cycle-way along Tempe river.
A new drainage system was built with twin bilge pumps to clear excess drainage water. I organised a new network connection from Ausgrid, and a new meter, to power the whole system. We installed 2 new poles, with a 40m overhead service main and 40 m overhead consumer main to a pump control station. The pump control station would activate the pump or pumps depending upon the level of water in the pit. |